Started Monday at "Long before O'dark thirty" with the electrical contractors, the Utilities and Energy Services folks for the University and the FAA to shut down power to everything the feeds through our parking area so it could all be switched to generator power. We'll be on Gensets for a week while the contractors build a new slab and pull in a new underground feed for a new switchbank and relocated transformers. Then we switch back to line power and they remove all of the overhead lines from our area to make way for a new two story building. that will sit pretty much everywhere in the picture above. Mostly everything went right. A couple of hickups highlighted things for us and for the airport to have a closer look at.